Send a request DEENSK [email protected]
Brick facade of the Die Macherei office quarter in Munich
Location
Munich, Bavaria
Year
2026
Trade
Electrical installation
Project type
Electrical second-fix and completion works (new build / refurbishment)
Scope
Final fitting of lighting, cabling and wiring accessories

Complete second-fix electrical works

On this project we carried out the complete final phase of the electrical installation. Our task was to turn a shell with the cables already prepared into a fully functional, safe space with modern lighting, ready to be lived in.

Work carried out as part of the project

  • Cable pulling and adjustment Adding missing cable routes, adapting existing wiring runs and thoroughly preparing the cables for connection of the end devices.
  • Installing and commissioning luminaires Complete installation of the interior lighting, including fitting designer chandeliers, recessing spotlights and mounting decorative LED strips. We also took care of installing the functional exterior lighting.
  • Completing sockets and switches Fitting and connecting all wiring accessories – from standard 230V sockets and switches to extra-low-voltage connections for internet (RJ45) and television.
  • Connecting kitchen appliances Professional connection of the built-in appliances (hob, oven), with confirmation of the warranty cards.
  • Final commissioning and check of the distribution board Interconnecting the circuits in the distribution board, fitting circuit breakers and RCDs, followed by a functional test of the entire network.

Result

The project was handed over on the set date, fully functional and to the highest quality, with an emphasis on aesthetic detail, cleanliness and safety.

Start a project

Planning a project?

Send us the key details of your construction site (start date, location, duration, number of workers). We will get back to you with an honest assessment of which trades we can take over and within what timeframe.