Project
Stadtwerke Neuruppin
Neuruppin, Brandenburg · 2025 – 2026
- Location
- Neuruppin, Brandenburg
- Year
- 2025 – 2026
- Trade
- Electrical installation
- Scope
- Complete turnkey electrical installation solution (both power and low-current) in accordance with German industrial standards (DIN/VDE).
Key points of the work
- First-fix electrical works and backbone routes Chasing of cable routes, fitting of back boxes and laying of the main cable runs. Complete preparation of the infrastructure for the office areas, the customer centre and the company's technical facilities.
- Data and communication networks Installation of robust structured cabling (LAN) linking the company servers, workstations, internal systems and customer terminals.
- Modern lighting and technology Complete installation of energy-saving LED panels for the offices, sensor-controlled corridor systems and emergency escape lighting. Cable connection of the ventilation system and the air-conditioning units.
- Main distribution boards and protection Assembly, installation and commissioning of the building's main distribution board and the sub-distribution boards. The system was fitted with surge protection devices and selective protection to ensure uninterrupted operation of the entire administration.
Result
The entire Stadtwerke Neuruppin building was handed over fully commissioned, tested and successfully inspected, to the required German quality. We created a technologically safe, reliable and modern administrative environment
Start a project
Planning a project?
Send us the key details of your construction site (start date, location, duration, number of workers). We will get back to you with an honest assessment of which trades we can take over and within what timeframe.